Infrastructure

Incorporation & Infrastructure:

  • 26000 Sq. Ft super built, spacious work facility, with adequate power of 90 HP.
  • An office block of 2000 Sq feet, stores of 1200 sq feet and a testing room of 800sq feet.
  • One over head crane of 30 tons & one 7.5 tons
  • Heating Oven (Suitable to Accommodate 20 MVA Transformers) 30 kW –         
  • Handling Capacity (Over Head Crane) – 30Tonne     
  • Handling Capacity (Over head Crane) – 7.5 Tons
  • Handling Capacity (Manual Crane) – 05 Tons                    
  • Oil Filter Machine (3000 LPH)                           
  • LV Winding Machine 7.5 HP
  • LV Winding Machine 5 HP      
  • HV Winding Machine 3 HP                    
  • Welding Machine    
  • Compressor
  • Gas Cutting Setup
  • Automatic Circle Cutting Machine (2ft)   
  • Radial Drilling Machine 1”       
  • Hand Grinding Machine
  • Hand Drilling Machine
  • Hand Cutting Machine    
  • Shearing Machine    
  • DG SET

Testing Equipments (Transformer unit):

  • Our In House Testing Structure Is Fit To Conduct All the Routine Tests as Per IS 2026 / 1180
  • Measurement of Winding Resistance.
  • Measurement of Voltage Ratio and Vector Group.
  • Measurement of Insulation Resistance.
  • Measurement of No Load Current and Losses.
  • Measurement of Load Loss and Impedance Voltage.
  • Separate Source Voltage Withstand Test.
  • Double Voltage Double Frequency Test.
  • Oil Breakdown Voltage Test (BDV).
  • Pressure Test for Transformer Tank.

THE TESTS WILL BE CONDUCTED IN A HIGH PRECESSION POWER ANALYZER.